Technical payload up to 28.13 t
Ocean and multimodal container shipping
Container shipping
Shanghai — Saint Petersburg
Shanghai — Saint Petersburg
We arrange container delivery from the agreed handover point in Shanghai to the port of Saint Petersburg. Customs coordination and onward warehouse delivery can be included where required.
Indicative transit time
50 daysThe estimate ends at arrival, before completion of clearance, container release or warehouse delivery. Shipment-specific timing is confirmed in the proposal and does not guarantee a direct sailing.
New shipment · current quote on request
Get a current rate by email
Leave your name and email. We will clarify cargo details and set out included services, separate charges and quotation validity.
Transport price
For the agreed transport plan
Cost breakdown
Included services and separate charges
Quotation terms
Validity and service conditions
You focus on your business. We coordinate the shipment.
We clarify handover points, terminals, equipment and costs. Where required, customs coordination and warehouse delivery are shown in the overall proposal.
The route is already selected
Cargo details clarified by email
Price, services and terms
Shipment details
Terms, costs and route
1Demurrage, detention and free time
Free time is the agreed period before container time charges apply. Demurrage generally concerns carrier equipment inside a terminal; detention concerns use outside it. Terminal storage may be charged separately. Start dates and separate or combined D&D periods are confirmed for the selected tariff.
Illustrative stages. Start dates and separate or combined D&D periods depend on the tariff. Terminal storage may be charged separately.
Agree the conditions before departure
We clarify when free time starts, the applicable allowance, the return depot and possible charges. A potential delay charge is not an automatic mandatory fee for every shipment.
2Ocean freight, handling and surcharges
The archived price does not establish the included scope. A current proposal identifies transport stages, included operations, separate charges and validity. Seasonal and winter surcharges are checked for the selected service.
| Item | What we clarify |
|---|---|
| Ocean freight | Ocean transport and applicable carrier surcharges. |
| THC / OTHC / DTHC | Origin and destination terminal handling, as specified in the proposal. |
| BAF / EBS / LSS / PSS | Applicable fuel and seasonal surcharges; definitions depend on the service. |
| Documentation and release | Carrier documents and release procedures. |
| Storage and equipment use | Storage, demurrage and detention terms, where applicable. |
| Warehouse delivery and return | Truck collection, delivery, unloading conditions and equipment return. |
| Customs services and payments | Service charges and statutory payments shown separately. |
3EXW, FCA, FOB Shanghai and freight terms
EXW, FCA and FOB Shanghai
Provide the Incoterms rule and named place or port agreed with the supplier. Collection from a warehouse, terminal handover and loading on board cover different stages and responsibilities. FOB refers to delivery on board at the named port; handing a container to a terminal alone is a different event.
FIFO, FILO, LIFO and LILO
These freight terms describe whether loading and unloading are included in the carrier rate. They do not automatically establish the scope of customs, documentation, terminal storage or warehouse delivery.
| Term | Meaning | Loading | Unloading |
|---|---|---|---|
| FIFO | Free In / Free Out | Excluded | Excluded |
| FILO | Free In / Liner Out | Excluded | Included |
| LIFO | Liner In / Free Out | Included | Excluded |
| LILO | Liner In / Liner Out | Included | Included |
4Container dimensions and cargo weight
Technical payload up to 28.75 t
Technical payload up to 28.60 t
| Type | Internal L × W × H, m | Volume, m³ | Payload, up to |
|---|---|---|---|
| 20DC / 20GP / 20DV | 5.900 × 2.352 × 2.395 | 33.2 | 28,13 t |
| 40DC / 40GP / 40DV | 12.032 × 2.352 × 2.395 | 67.7 | 28,75 t |
| 40HC / 40HQ | 12.032 × 2.350 × 2.700 | 76.3 | 28,60 t |
Dimensions, volume and payload are examples of carrier equipment, not a guaranteed loading allowance. Actual cargo weight is limited by the container plate, carrier, terminal, road and rail restrictions, as applicable. Confirm equipment and loading conditions before booking.
Reefer equipment and cargo-specific conditions are described below.
5Shanghai, Saint Petersburg and shipment documents
Illustrative operations, not a geographical map, confirmed direct sailing or timetable.
Origin · China
Shanghai
Yangshan, Waigaoqiao and Wusong are different port areas. The city name does not identify the acceptance terminal. We confirm the terminal, handover point, container acceptance conditions and documentation cut-offs before booking.
Destination · Russia
Saint Petersburg
The destination name does not identify a particular Saint Petersburg terminal. Port facility, container release, customs arrangements and onward delivery are agreed for the shipment.
Shipment documents and planned dates
We clarify the commercial invoice, packing list, shipping instructions, bill of lading, VGM and cargo-specific documents. ETD and ETA are planned departure and arrival dates, not a guarantee of warehouse delivery. Booking cut-offs and readiness requirements are checked separately.
6Route options and shipment scope
Key points for this route
Where cargo is handed over
Provide the supplier’s address or handover point in Shanghai. Collection and preparation before loading on board fall outside the stated transit-time measurement.
Where the timing ends
For Saint Petersburg, the endpoint is port arrival. It does not mean clearance, container release or warehouse delivery has been completed.
What a new quote covers
The proposal specifies equipment, transport legs, included services, separate charges and quotation validity. An archived amount is not automatically applied to a new shipment.
What the quote includes
The handover point in Shanghai and final delivery point.
The container, cargo specifications and selected transport plan.
Included services and separate charges.
Estimated timing and the conditions that apply.
Container use and return conditions, where applicable.
Quotation validity and information still to be confirmed.
Route specifics
To a port or to your warehouse?
To a port in Saint Petersburg
We can assess the ocean leg to an agreed port. The proposal will clarify the origin handover point, release conditions, included operations and separate charges.
To the consignee’s warehouse
If onward delivery is required, we discuss clearance and inland transport. The quote needs the address and receiving and unloading conditions. These stages are included only under an agreed request.
Handover point. Supplier collection and port handover have different scopes.
Equipment and cargo. Container type, weight, packaging and special requirements affect service selection.
Ocean service. We check available options, potential transshipments and departure conditions.
Operations after arrival. We consider required port services, clearance and warehouse delivery.
Current pricing and estimated timing are confirmed for your consignment. The proposal specifies which stages the quote covers.
Questions about this route
?How is the transit time measured?
Approximately 50 days from loading on board to arrival at the port of Saint Petersburg.
?How much does a container from Shanghai to Saint Petersburg cost?
This page shows archived offers from October 2026. Request a current rate for a new shipment; pricing depends on equipment, cargo and the delivery scope.
?Is a direct sailing available?
We check direct and transshipment options when preparing the quote. The specific service is confirmed before booking.
?Can you collect from the supplier?
Provide the address and cargo handover terms. We will assess collection availability and cost as a separate stage of the overall plan.
?Is warehouse delivery included in the price?
Only if it is included in the agreed proposal. The scope of the quote and additional charges are identified separately.
?Can customs clearance be arranged?
Include this requirement in your enquiry. We will agree the documents, parties involved and cost of that stage.
Additional conditions
SOC and COC
COC is carrier-owned equipment; SOC is shipper-owned equipment. We confirm equipment acceptance, free time, return arrangements and any applicable storage charges.
Reefer equipment
Reefer equipment is quoted separately. Temperature, ventilation, humidity, loading conditions and continuous power requirements must be agreed before booking. Equipment specifications depend on the actual unit.
Dangerous goods
Acceptance is confirmed for the specific cargo, carrier and terminal. Provide the UN number, hazard class, SDS, packaging and quantity. Applicable sea and road transport requirements are reviewed for the selected legs.
Services for your shipment