Technical payload up to 28.13 t
Ocean and multimodal container shipping
Container shipping
Shanghai — Moscow
Shanghai — Moscow
We arrange container delivery from the agreed handover point in Shanghai to a terminal in Moscow. Customs coordination and onward warehouse delivery can be included where required.
Indicative transit time
30 daysThe estimate ends at arrival, before completion of clearance, container release or warehouse delivery. Shipment-specific timing is confirmed in the proposal and does not guarantee a direct sailing.
New shipment · current quote on request
Get a current rate by email
Leave your name and email. We will clarify cargo details and set out included services, separate charges and quotation validity.
Transport price
For the agreed transport plan
Cost breakdown
Included services and separate charges
Quotation terms
Validity and service conditions
You focus on your business. We coordinate the shipment.
We clarify handover points, terminals, equipment and costs. Where required, customs coordination and warehouse delivery are shown in the overall proposal.
The route is already selected
Cargo details clarified by email
Price, services and terms
Shipment details
Terms, costs and route
1Demurrage, detention and free time
Free time is the agreed period before container time charges apply. Demurrage generally concerns carrier equipment inside a terminal; detention concerns use outside it. Terminal storage may be charged separately. Start dates and separate or combined D&D periods are confirmed for the selected tariff.
Illustrative stages. Start dates and separate or combined D&D periods depend on the tariff. Terminal storage may be charged separately.
Agree the conditions before departure
We clarify when free time starts, the applicable allowance, the return depot and possible charges. A potential delay charge is not an automatic mandatory fee for every shipment.
2Ocean freight, handling and surcharges
The archived price does not establish the included scope. A current proposal identifies transport stages, included operations, separate charges and validity. Seasonal and winter surcharges are checked for the selected service.
| Item | What we clarify |
|---|---|
| Ocean freight | Ocean transport and applicable carrier surcharges. |
| THC / OTHC / DTHC | Origin and destination terminal handling, as specified in the proposal. |
| BAF / EBS / LSS / PSS | Applicable fuel and seasonal surcharges; definitions depend on the service. |
| Documentation and release | Carrier documents and release procedures. |
| Storage and equipment use | Storage, demurrage and detention terms, where applicable. |
| Warehouse delivery and return | Truck collection, delivery, unloading conditions and equipment return. |
| Customs services and payments | Service charges and statutory payments shown separately. |
3EXW, FCA, FOB Shanghai and freight terms
EXW, FCA and FOB Shanghai
Provide the Incoterms rule and named place or port agreed with the supplier. Collection from a warehouse, terminal handover and loading on board cover different stages and responsibilities. FOB refers to delivery on board at the named port; handing a container to a terminal alone is a different event.
FIFO, FILO, LIFO and LILO
These freight terms describe whether loading and unloading are included in the carrier rate. They do not automatically establish the scope of customs, documentation, terminal storage or warehouse delivery.
| Term | Meaning | Loading | Unloading |
|---|---|---|---|
| FIFO | Free In / Free Out | Excluded | Excluded |
| FILO | Free In / Liner Out | Excluded | Included |
| LIFO | Liner In / Free Out | Included | Excluded |
| LILO | Liner In / Liner Out | Included | Included |
4Container dimensions and cargo weight
Technical payload up to 28.75 t
Technical payload up to 28.60 t
| Type | Internal L × W × H, m | Volume, m³ | Payload, up to |
|---|---|---|---|
| 20DC / 20GP / 20DV | 5.900 × 2.352 × 2.395 | 33.2 | 28,13 t |
| 40DC / 40GP / 40DV | 12.032 × 2.352 × 2.395 | 67.7 | 28,75 t |
| 40HC / 40HQ | 12.032 × 2.350 × 2.700 | 76.3 | 28,60 t |
Dimensions, volume and payload are examples of carrier equipment, not a guaranteed loading allowance. Actual cargo weight is limited by the container plate, carrier, terminal, road and rail restrictions, as applicable. Confirm equipment and loading conditions before booking.
Reefer equipment and cargo-specific conditions are described below.
5Shanghai, Moscow and shipment documents
Illustrative operations, not a geographical map, confirmed direct sailing or timetable.
Origin · China
Shanghai
Yangshan, Waigaoqiao and Wusong are different port areas. The city name does not identify the acceptance terminal. We confirm the terminal, handover point, container acceptance conditions and documentation cut-offs before booking.
Destination · Russia
Moscow
Moscow refers to an inland destination, not a seaport. The exact terminal, inland legs and release arrangements are confirmed for the selected service.
Shipment documents and planned dates
We clarify the commercial invoice, packing list, shipping instructions, bill of lading, VGM and cargo-specific documents. ETD and ETA are planned departure and arrival dates, not a guarantee of warehouse delivery. Booking cut-offs and readiness requirements are checked separately.
6Route options and shipment scope
Key points for this route
Where cargo is handed over
Provide the supplier’s address or handover point in Shanghai. Collection and preparation before loading on board fall outside the stated transit-time measurement.
Where the timing ends
For Moscow, the endpoint is arrival at a terminal. Release, equipment return and warehouse delivery arrangements are agreed for the shipment.
What a new quote covers
The proposal specifies equipment, transport legs, included services, separate charges and quotation validity. An archived amount is not automatically applied to a new shipment.
What the quote includes
The handover point in Shanghai and final point in Moscow.
The selected transport plan and delivery stages.
Equipment and agreed cargo specifications.
Included services, separate charges and quote scope.
Handover, release and container return conditions.
Estimated timing and quotation validity.
Route specifics
Delivery options
Via Russian Far East ports
An ocean leg to an agreed port, followed by inland transport to a Moscow terminal or warehouse. We check connections between stages, equipment availability and inland service conditions.
Via North-West Russia ports
An ocean leg to an agreed port in North-West Russia, followed by transport to the final point in Moscow. We assess this plan against the shipment requirements and available services.
Terminal release
We clarify the agreed terminal, release procedure and destination charges. Responsibility for onward collection and container return needs to be defined in advance.
Warehouse delivery
The quote requires the address and access, receiving and unloading conditions. Container handling and equipment return arrangements are agreed separately.
These plans are options for discussion. Availability, ports, equipment and terms are confirmed for each shipment. Not every option is suitable for every cargo.
Sequence of stages. Ocean and inland legs need coordinated connections.
Delivery endpoint. A terminal and a specific warehouse require different operations.
Container and cargo. Equipment, weight, packaging and restrictions affect the selected plan.
Readiness for handovers. Documents, clearance and transfer conditions affect onward container movement.
The quote separates agreed transport legs from additional services. Timing is estimated for the selected plan, with the stages covered clearly identified.
Questions about this route
?How is the transit time measured?
Approximately 30 days from loading on board to arrival at a terminal in Moscow.
?Is this an ocean or rail shipment?
The plan considered here combines ocean and inland transport. The inland leg may use rail and/or road depending on the selected service. The specific sequence is confirmed in the proposal.
?Can I choose the arrival port in advance?
Yes. Add your preference in the comments. We will check availability and conditions for your cargo. If the overall delivery requirement to Moscow is the priority, we will select a plan around that task.
?Is delivery from the station or terminal to the warehouse included?
Only if this stage is included in the agreed proposal. Provide the address and receiving conditions for a quote.
?How should I compare options?
Compare the same delivery scope and services. Our proposal identifies the transport stages and separate charges so that the basis of the quote is clear.
Additional conditions
SOC and COC
COC is carrier-owned equipment; SOC is shipper-owned equipment. We confirm equipment acceptance, free time, return arrangements and any applicable storage charges.
Reefer equipment
Reefer equipment is quoted separately. Temperature, ventilation, humidity, loading conditions and continuous power requirements must be agreed before booking. Equipment specifications depend on the actual unit.
Dangerous goods
Acceptance is confirmed for the specific cargo, carrier and terminal. Provide the UN number, hazard class, SDS, packaging and quantity. Applicable sea and road transport requirements are reviewed for the selected legs.
Services for your shipment